Hôm nay, Thứ 7 15/08/26 2:38

Thời gian được tính theo giờ UTC + 7 Giờ




Tạo chủ đề mới Gửi bài trả lời  [ 1 bài viết ] 
Người gửi Nội dung
Gửi bàiĐã gửi: Thứ 2 10/04/23 9:38 
Ngoại tuyến

Ngày tham gia: Thứ 3 16/08/22 10:15
Bài viết: 562
BVS Cranes has supplied an overhead gantry crane for the UK’s HS2 rail project.

gantry crane
overhead crane

HS2 FACTS

Over 250 miles of new high-speed line is planned across the UK

HS2 trains will stop at more than 25 stations

The network will connect 30 million people

The High Speed Two (HS2) railway is a mammoth infrastructure project designed to deliver faster travel times to towns and cities up and down the UK – from the south-east to the north-west.

One of its most complex sections is the Delta Junction, where the new railway splits, curving west towards Birmingham and north towards Crewe. It includes a network of nine viaducts constructed from getting on for 3,000 precast concrete segments, to be made at a manufacturing yard in Warwickshire that belongs to HS2’s infrastructure partner Balfour Beatty Vinci (BBV).

Requiring a large gantry crane with a hydraulic spreader to work under the hook, BBV turned to BVS Cranes to supply both, awarding the contract in late 2021.

The crane – which spans 54m, is 15m high, has a capacity of 87.5 tons, operates on a runway length of 530m and is equipped with an 8.0-ton auxiliary hoist – has been designed to lift the concrete segments during the manufacturing and transportation phases.

During its two years in operation it will lift every segment, with each one weighing up 80 tons. Each segment will be moved a minimum of two times, meaning a total of up to 6,000 successful operations is targeted.

To facilitate installation at the site, the crane was designed without welding, and was constructed using only bolts and nuts.

Meanwhile, the hydraulic spreader has a safe working load (SWL) of 82 tons and is designed to grab, position and stack concrete segments of different shapes.

Like the gantry crane, it is engineered, manufactured and fully tested by BVS. BVS has supplied cranes for similar concrete operations before, notably for a Bechtel and Enka joint venture on a Serbian highways construction, as well for other projects in Sweden, the Netherlands and Lithuania. The Turkish company has also been involved in other infrastructure projects, such as France’s Reunion Island coastal road. The HS2 crane is its largest UK product to date.

Önder Topuz, BVS business development, marketing and brand manager, says the firm was pleased the customer puts its trust in “BVS Cranes to make this”. He adds it is a project BVS is very proud of completing.

BBV, meanwhile, expects on-site assembly of the segments for the Delta Junction viaducts to start in the summer of 2023.

HS2 itself will begin running between 2029 and 2033 when Phase One is complete. Services will expand as new sections of the network are built.

BVS Cranes has supplied an overhead gantry crane for the UK’s HS2 rail project


Đầu trang
 Xem thông tin cá nhân  
 
Hiển thị những bài viết cách đây:  Sắp xếp theo  
Tạo chủ đề mới Gửi bài trả lời  [ 1 bài viết ] 

Thời gian được tính theo giờ UTC + 7 Giờ


Ai đang trực tuyến?

Đang xem chuyên mục này: Không có thành viên nào đang trực tuyến1 khách


Bạn không thể tạo chủ đề mới trong chuyên mục này.
Bạn không thể trả lời bài viết trong chuyên mục này.
Bạn không thể sửa những bài viết của mình trong chuyên mục này.
Bạn không thể xoá những bài viết của mình trong chuyên mục này.
Bạn không thể gửi tập tin đính kèm trong chuyên mục này.

Tìm kiếm với từ khoá:
Chuyển đến:  
Chứng nhận thanh toán bảo đảm

CÔNG TY TNHH DỊCH VỤ HÀNG HOÁ TRỰC TUYẾN

Diễn đàn sử dụng phần mềm phpBB® Forum


Chợ xây dựng Hà nội: Công ty TNHH Thương mại Dương Linh

Showroom: Số 1B, Ngõ 5, tổ 19, thị trấn Cầu Diễn, Huyện Từ Liêm, Thành phố Hà nội

Tel: 04.37737548; Fax: 04.38370082

Email Phòng kinh doanh: sale@choxaydung.vn

Chợ xây dựng Sài Gòn: Công ty TNHH SX-TM Đăng Hải

Địa chỉ: Số 140, Tô Hiến Thành, P15, Quận 10, Tp.HCM

Tel: 08.38620524; Fax: 08.38633011;

Email: saigonRep@choxaydung.vn